Klein Engineering

Dipl. Ing. ETH/SIA

Ram Jhula Nagpur – Maharashtra India

Twin Cable STayed Bridge crossing the Nagpur Junction Railway station. Total Length: 606 m. Road Lanes and Blue Line Metro Tracks.

Owner: Maharashtra State Road Development Corporation (MSRDC)

Structural Design: STUP Consultants Pvt. Ltd. Nariman Point Mumbai

Contractor: AFCONS INFRASTRUCTURE LIMITED

Heavy Lifting and Stay Cable Technology: BBR India Ltd.

Contribution of Bridgelab by Pascal Klein: Stay Cable and Single Strand Installation Consultant
Photos: BBR India Ltd.

Youtube: Indranil Bhattacharjee (Ignited Images)

Weiter Beitrag

Zurück Beitrag

© 2024 Klein Engineering

Thema von Anders Norén