240 m long in situ balanced cantilever bridge across the Mesurado River with a main span of 100 m, deck width 13 m. Completion 2010.
Owner: Government of Liberia, Ministry of Public Works
Structural Design: GASH Bridge & Building Engineering Ltd.
Contractor: ChongQing International Construction Company (CICO)
Final Design, Shop Drawings and Geometry Control: Finley Engineering Group
Contribution of Pascal Klein: Design assistance and Third Party Checking
Photos: GASH Engineering