Klein Engineering

Dipl. Ing. ETH/SIA

Talomo Matina Bridge Davao City Mindanao Philippines

Incrementally launched bridge over 11 x 60.00 m spans. Straight in plan. Total length 660.00 m, deck width 19.60 m. High degree of prestressing. Slender deck depth 3.50 m. Under construction 2021-2023.

Client: Davao Coastal Road, Department of Public Works and Highways, Republic of the Philippines
Contractor: Ulticon Builders Inc., Davao City
Design of Superstructure: BBR Construction Systems / Meichtry Widmer AG
Preliminary Design Calculations by P. Klein on behalf of Meichtry Widmer AG

Youtube: Banar Drones

Weiter Beitrag

© 2024 Klein Engineering

Thema von Anders Norén